Substation for wind turbine project

CDC supplied a precast concrete cabin for IDETA

At CDC – Cabines de Ciney, we are all about creating impressive precast concrete cabins, and we are proud to share a recent project that perfectly embodies our passion and expertise. In early 2020, we delivered a 14-meter precast concrete cabin for a wind farm along the E42 motorway in Tournai.

Size and Functionality: This giant prefabricated cabin, measuring 14 meters in length, was specially designed to meet the specific requirements of the wind turbine project. The size and robustness of the cabin allow it to safely and efficiently house the necessary equipment and infrastructure. This project highlights our ability to create large and complex precast concrete structures that fit perfectly within today’s renewable energy solutions.

More about precast concrete cabins?

What exactly does the project entail?

The painted aluminum door with a useful height of 2600mm allows the installed medium voltage cells to be brought inside without the need to temporarily take off the exceptionally long roof. This was an important logistical requirement since the cells to be installed were only available at a later stage, and provided the transit along the 2600mm high door, the hiring of an expensive crane could be avoided.

CDC – Cabines de Ciney provided this cabin that feeds a total of 4 sub-cabs as the main purchasing station.

 

 

Looking for a turnkey concept from CDC?

The total solutions for all your precast concrete cabin applications.

Contact us

View more realisations

Precast concrete substation with brick cladding

Prefab substation for Industrial Applications

2 Substations for PSA Antwerp